Groundbreaking Energy Efficiency Retrofit Project at Empire State Building
Using the Empire State Building as a test case and model, world-class environmental consulting, non-profit, design and construction partners – including the Clinton Climate Initiative (CCI), Rocky Mountain Institute (RMI), Johnson Controls Inc. (NYSE: JCI) (JCI) and Jones Lang LaSalle (NYSE: JLL) (JLL) – this week unveiled an innovative process for analyzing and retrofitting existing structures for environmental sustainability.
Adopted as core elements of the more than $500 million upgrade program presently underway at the world’s most famous office building, the program is the first comprehensive approach that integrates many steps to use energy more productively. The program is expected to reduce energy consumption by up to 38 percent and will provide a replicable model for similar projects around the world. Work has already commenced, and building systems work is slated to be completed by year-end 2010. The balance of the work in tenant spaces should be concluded by end of 2013. Work that is scheduled to be completed within 18 months will result in over 50 percent of the projected energy savings. The balance will be an additional 36 months completed by 2013.
Educational Webinars, Videos & Podcasts: Receive cutting-edge insights and invaluable resources, empowering you to stay ahead in the dynamic world of security.
Empowering Content: At your computer or on-the-go, stay up-to-date when you receive our eNewsletters curated with the latest technology and services that address physical, logical, cyber and enterprise resilience.
Unlimited Article Access: Dive deep into the world of cybersecurity and risk management leadership with unlimited access to our library of online articles.